ThermoVerra installs new lab equipment and moves units when your lab relocates. Our technicians handle the site checks, startup, and verification, so every unit goes into service ready to use and fully documented.
Installation Services
What every installation covers:
Site Check: Dedicated circuit and voltage, wall and ceiling clearance, room temperature, door swing.
Startup: Leveling, startup to manufacturer specifications, and alarm setup.
Verification: Once the unit stabilizes at setpoint, we verify it against a NIST-traceable reference before you load it.
Documentation: An installation record for your files and your inspectors.
Lab Relocation
Whether you're moving across the building or across town, we help plan the process and get your equipment back in service quickly. Each unit gets a pre-move check, a planned power-down, transport by either ThermoVerra or your mover, then a restart, stabilization, and verification before samples go back in.
FAQs
-
Yes, we can install equipment delivered by a distributor and manage the process from uncrating to startup and verification.
-
Let it reach setpoint and stabilize, typically for 24-48 hours, and then verify before loading.
-
Yes, we can sequence the move based on your planned moving schedule, and then restart and verify each unit before samples go back in.